[Construction Example] Kawaguchiko IC L5 Lane: CO Pavement Slab Step-Down Settlement Correction Work
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
We would like to introduce a case of "CO pavement slab step depression correction work" conducted at the Kawaguchiko IC L5 lane of the Chuo Expressway Fujiyoshida Line in Yamanashi Prefecture. The construction period was one day. We carried out the step correction of the CO pavement slabs within the toll booth. After traffic regulation, we positioned the construction plant vehicle inside the toll booth for the work. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Area: Chuo Expressway Fujiyoshida Line Maintenance Work Kawaguchiko IC L5 Lane ■ Construction Period: 1 day (April 2011) ■ Client: Central Nippon Expressway Company Limited ■ Main Contractor: Central Nippon Highway Maintenance Company Limited *For more details, please refer to the PDF materials or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other