[Construction Example] Kawaguchiko IC L5 Lane: CO Pavement Slab Step-Down Settlement Correction Work

Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.

We would like to introduce a case of "CO pavement slab step depression correction work" conducted at the Kawaguchiko IC L5 lane of the Chuo Expressway Fujiyoshida Line in Yamanashi Prefecture. The construction period was one day. We carried out the step correction of the CO pavement slabs within the toll booth. After traffic regulation, we positioned the construction plant vehicle inside the toll booth for the work. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Area: Chuo Expressway Fujiyoshida Line Maintenance Work Kawaguchiko IC L5 Lane ■ Construction Period: 1 day (April 2011) ■ Client: Central Nippon Expressway Company Limited ■ Main Contractor: Central Nippon Highway Maintenance Company Limited *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Road construction
  • Ground foundation construction method
  • Pavement level difference correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Highway Toll Booth Concrete Pavement: Leveling Work

An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!

We would like to introduce a case of "leveling repair work" conducted on the concrete pavement slab at a toll booth on the expressway in Ehime Prefecture. Due to ground subsidence, a height difference occurred in the concrete pavement slab at the expressway toll booth, affecting the passage of vehicles. We injected polyurethane resin under the subsided concrete pavement slab and quickly corrected a 30mm height difference. 【Case Summary】 ■ Construction Area: 12m² ■ Construction Period: 1 day ■ Maximum Height Difference: 30mm *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Road construction
  • Ground foundation construction method
  • Pavement level difference correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Pavement level difference correction work